| Design and construction
of Pre-stressed engineering of Traffic
Center for Shanghai Pudong International
Airport (Phase II) |
|
|
The main
stadium of Huanglong Sports Center -
Structural design of the cable stayed
canopy, structural model test and wind
tunnel test, and speciality contract
of the cable stayed structure, prestressed
concrete structure and mechanical splicing
of rebars |
|
|
|
| The new building of Beijing
Planetarium - Computation and analysis
on the curtain wall structure |
|
| Inspection and appraisal
for the main structure of Yanxi Palace
of Imperial Palace Museum |
|
|
|
| The Railway Station in
Nanjing, Jiangsu Province - Structural
design of the cable stayed steel roof,
shaking table on the structural model,
structural joints test and wind tunnel
test |
|
| Specialty contract of
steel bar splicing engineering of Sutong
Bridge over Yangtse Rive, the largest
dual-tower and dual-cable-stayed bridge
of its kind in the world |
|