| The patented post-grouting technology
was used for the pile foundation of
the National Gymnasium project. |
|
| Crushed stone pile drainage strong
compaction technology was used for the
one million tons bulk storeroom of Qinhai
Saline Potash Fertiliser with halomorphic
soil foundation. |
|
 |
|
| The patented technology of continuous-flight
auger and reinforcement cage was used
in piling engineering of Jingdongfang
project, located in Beijing Economic-technological
Development Area. |
|
| The combined ditch pile anchor foundation
treatment, integrating nailed wall support
and CFG pile, was adopted in the National
Conference Center project of Olympic
Park (Area B). |
|
 |
|
The composite structure with soil-nailed
wall, support pile and anchor rods was
adopted in the foundation pit support
of the Commercial Mall project.
|
|
| Advanced reinforcement of horizontal
jet-grouting piles for the heat-supply
pipeline project at the underground
intersection of the north third ring
road and Hepingli Subway Station in
Beijing |
|
|
|
| Calculation and analysis of the reaction
and the interaction of deformation for
the foundation of Beijing Fortune Center
projecr |
|
| Calculation and analysis for the foundation
scheme of Beijing PetroChina Building |
|
|
|
| Design software for the foundation
pit and slope support structure |
|
| The diaphragm wall and post-grouting
technology was used for the deep foundation
pit of the Headquaters of Bank of China
designed with the software (left picture),
which made the diaphragm and basement
working together. |
|